Positive conclusion

Received a positive conclusion non-stage expertise on “Reconstruction of 110kV c99/100 “Abakan-Rajonnaya-Yuznaya” I,II circuit with taps”.

Number of conclusion 4-1-1-0010-14 from 14 October  2014. The object of  non-stage expertise – design documentation without estimates.